{"id":2179,"date":"2020-12-28T10:43:54","date_gmt":"2020-12-28T02:43:54","guid":{"rendered":"http:\/\/www.liout.com\/?p=2179"},"modified":"2023-01-05T18:11:53","modified_gmt":"2023-01-05T10:11:53","slug":"2020-2021%e7%ad%91%e9%be%99%e5%bb%ba%e7%ad%91%e5%b7%a5%e7%a8%8b%e8%87%b3%e5%b0%8a%e5%a5%97%e9%a4%90%e4%ba%91%e7%9b%98%e4%b8%8b%e8%bd%bd%e5%85%8d%e8%b4%b9%e5%88%86%e4%ba%ab%e9%95%bf%e6%9c%9f%e6%9b%b4","status":"publish","type":"post","link":"https:\/\/www.edumails.cn\/en\/2020-2021%e7%ad%91%e9%be%99%e5%bb%ba%e7%ad%91%e5%b7%a5%e7%a8%8b%e8%87%b3%e5%b0%8a%e5%a5%97%e9%a4%90%e4%ba%91%e7%9b%98%e4%b8%8b%e8%bd%bd%e5%85%8d%e8%b4%b9%e5%88%86%e4%ba%ab%e9%95%bf%e6%9c%9f%e6%9b%b4.html","title":{"rendered":"Chikuyu construction engineering supreme package cloud disk download free sharing long-term update"},"content":{"rendered":"<p>zhulong construction engineering supreme package (159.67G)<\/p>\n<p><img class=\"aligncenter\" src=\"https:\/\/s3.ax1x.com\/2021\/01\/28\/ySBQl8.png\" \/><\/p>\n<p><span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: large;\"><strong>The whole set of tutorials has 79 folders with 150G contents, all of which are video tutorials. The content involves code interpretation + construction technology + data preparation + project management, assembly building policy interpretation and construction technology, EPC general contracting project management and application, assembly concrete shear wall structure construction technology, 27-story high-rise residential building structural construction drawing reading, reinforcing steel literacy (engineering examples) and so on, 79 aspects of the content, a total of 1176 hours.<\/strong><\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">Catalog:<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250101. Interpretation of 16G101 reinforcing steel leveling atlas (beams, slabs, columns, walls, foundations, stairs)<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u2501 02. \"Building construction work at height safety technical specification\" JGJ80-2016 interpretation<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250103.Safety Technical Specification for Temporary Electricity Use in Construction Sites JGJ46-2005 Interpretation and Application<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u2501 04. \"Safety Technical Code for Fastened Steel Pipe Scaffolding\" JGJ130-2011 Graphic Interpretation<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u2501\u250105. Safety Technical Interpretation of Fastened Steel Pipe Full Tall Scaffolding for Building Construction<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250106.Safety Technical Specification for the Installation, Demolition and Use of Tower Cranes (JGJ196-2010) Graphic Interpretation<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250107.10 Interpretation of this common construction engineering quality acceptance construction specification (Instructor: Carpenter)<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250108.Building construction code key provisions detailed analysis<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250109. Interpretation and application of safety inspection standards for building construction (JGJ59-2011)<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250110.27-story frame shear wall high-rise residential building construction technology details (construction preparation - structural acceptance)<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250111. Interpretation of assembly building policy and construction technology (including construction cases)<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250112. 188 causes of common quality problems in construction engineering and prevention and control measures graphic teaching (foundation &amp; main body &amp; decoration, etc.)<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250113. Construction calculations (hand calculations, software, examples) of the necessary skills for general workers<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250114.Quickly master the construction project construction data preparation skills (data clerk essential)<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250115. Comprehensive pipeline corridor construction technology and practical cases<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250116. Introduction to the basic operation of Auto CAD software<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250117.EPC General Contracting Project Management and Application<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250118. Building construction practice of building drawing reading and knowledge of drawings<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250119.Building construction practice of structural drawing reading and knowledge of drawings<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250120. Building Finishes Reading and Recognizing Drawings Practical Explanation<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250121. Construction project surveying instrument practical operation, measurement management and control details (construction site live recording)<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State\u2501\u250122.Roofing membrane waterproofing &amp; rigid waterproofing &amp; membrane waterproofing 3 major control points<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u2501 23. Essential skills for the preparatory phase of housing construction<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250124. Piling Construction Technology Details<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250125. Play around with shallow foundation construction such as free-standing foundation, strip foundation, raft foundation, box foundation, etc.<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250126. Deep foundation pits in complex conditions<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250127.earth excavation &amp; pit support &amp; construction of precipitation construction technology points in detail<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250128. Detailed case study of integrated construction technology of reverse engineering method<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250129. Reinforcing Steel Programming, Reinforcing Steel Fabrication and Taping Quickstart (live construction site instruction)<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250130. Fastened steel pipe racks, bowl fastened racks, plate fastened racks, large steel formwork, aluminum formwork and formwork calculations, and demonstration of more hazardous braced frames from zero to proficient.<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250131. Concrete site construction of construction joints, the consequences of brutal construction, the quality of the case of common diseases explained<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u2501 32. Masonry construction technology analysis (on-site practical teaching)<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250133. Underground engineering waterproofing of rigid waterproofing &amp; membrane waterproofing &amp; coil waterproofing construction technology case study<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u2501 34.Luban award project template is how to do it<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250135.Luban award project concrete is how to do it<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u2501 36. Tips for Implementing Reinforcing Steel Construction for Superior Projects<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250137. 88 key points of the site quality acceptance of construction works<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250138. The whole process of villa construction example interpretation<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0Common Quality Problems and Solutions of Decoration and Renovation<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250140.Civil Engineer Decoration Construction Management Technology Practical Specialized Lecture<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250141.Civil engineers must skills technical delivery series of ground engineering<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250142. Civil engineers must have the skills of technical briefing series of lightweight partition walls<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250143.Civil Engineer Essential Skills Technical Briefing Series of Plastering - Simple and Complicated Sub-works<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250144.civil engineer essential skills technical brief series of light steel keel gypsum board &amp; mineral wool acoustic panels &amp; aluminum square board &amp; aluminum square grille ceiling<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250145.Decoration and decoration engineering aluminum alloy doors and windows construction technology analysis<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250146. Core elements of green construction technology and management (on-site practical teaching)<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250147. Technical management control of the whole process of building construction<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250148. Winter, rainy construction of each sub-part of the technical safeguard measures comprehensive analysis<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250149. Construction Project Data Preparation and Management Skills for Construction Project Data Clerks<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0Techniques of handling engineering negotiation &amp; design change &amp; on-site visas<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250151.The main points of the argumentation of the special program for safety of dangerous formwork supporting frame works<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250152. Site laboratory equipment and testing of raw steel, rebar joints, concrete, etc. from entry to mastery<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250153. Key points for the preparation of construction organization design in the implementation stage &amp; bidding stage<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u2501 54. Reinforcement, formwork, concrete construction program and technical delivery preparation points<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250155.Quickly learn to prepare construction organization design &amp; floor plan &amp; progress plan<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250156.Construction Site Schedule Preparation Key Points&amp;Case&amp;Implementation&amp;Check&amp;Analysis Adjustment Essentials<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250157.Two hours quick learning external scaffolding program preparation of the landing frame &amp; overhanging frame &amp; attached frame<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u2501 58. Civil Engineer Safety Control &amp; Civilized Construction &amp; Safety Data Essential Skills<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250159. General Contractor Project Management Practical Seminar Series<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250160. Construction Cost Management for Civil Engineers - Essential Course to Improve Management Skills<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250161.Civil Engineer Management Skills Enhancement Essential Course on Construction Materials Management<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250162.Civil Engineer Management Skills Enhancement Course on Construction Coordination Management<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250163. Civil Engineer Management Skills Enhancement Essential Course on Project Closeout Management<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250164. Quality Management for Civil Engineers Essential Management Skills<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250165.Civil Engineer Management Skills Enhancement Course on Project Technical Management<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250166. General Contractor Project Management Practical Lecture Series--Quality Management Essentials<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250167.General Contractor Project Management Practical Lecture Series--Labor Management Essentials<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250168. General Contractor Project Management Practical Lecture Series - Key Points of Site Management<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250169. Building site layout &amp; management experience &amp; start-up procedures &amp; strategies for dealing with inspections<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250170. Project management skills necessary for people management<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250171.Analysis of quality management, quality acceptance and quality incident handling skills during project construction.<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250172. Civil Engineer Decorative Finishing Materials Must Know Points<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250173. Methods of Inspection and Testing of Construction Materials and On-site Management of Building Construction Projects<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250174. Essential Management Skills of a Good General Manager<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250175. Project Manager Professional Competency Enhancement Skills<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0The State's 76.20-year project general manager talks about the success or failure of technical management.<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0State \u2501\u250178.Project General Manager essential management skills of project hazard identification and risk assessment<\/span><\/span><br \/>\n<span style=\"font-family: \u5b8b\u4f53;\"><span style=\"font-size: medium;\">\u00a0 \u00a0\u00a0 \u00a0Explanation of the key points of the whole process of PPP project<\/span><\/span><\/p>\n<p><span style=\"color: #000000;\"><span style=\"font-size: medium;\">https:\/\/www.aliyundrive.com\/s\/V9GEprQocC7<\/span><\/span><\/p>\n<p><span style=\"color: #000000;\"><span style=\"font-size: medium;\">https:\/\/www.aliyundrive.com\/s\/4YX5a58nPhs Please leave a message if it is not working.<\/span><\/span><\/p>","protected":false},"excerpt":{"rendered":"<p>zhulong Construction Engineering Supreme Package (159.67G) The whole set of tutorials has 79 folders with 150G of content, all of which are video tutorials. The content involves code interpretation + construction technology + data preparation + project management, assembly building policy interpretation and construction technology, EPC general contracting project management and application, assembly concrete shear wall structure construction technology...<\/p>","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[5],"tags":[742],"topic":[],"_links":{"self":[{"href":"https:\/\/www.edumails.cn\/en\/wp-json\/wp\/v2\/posts\/2179"}],"collection":[{"href":"https:\/\/www.edumails.cn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.edumails.cn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.edumails.cn\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.edumails.cn\/en\/wp-json\/wp\/v2\/comments?post=2179"}],"version-history":[{"count":2,"href":"https:\/\/www.edumails.cn\/en\/wp-json\/wp\/v2\/posts\/2179\/revisions"}],"predecessor-version":[{"id":3837,"href":"https:\/\/www.edumails.cn\/en\/wp-json\/wp\/v2\/posts\/2179\/revisions\/3837"}],"wp:attachment":[{"href":"https:\/\/www.edumails.cn\/en\/wp-json\/wp\/v2\/media?parent=2179"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.edumails.cn\/en\/wp-json\/wp\/v2\/categories?post=2179"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.edumails.cn\/en\/wp-json\/wp\/v2\/tags?post=2179"},{"taxonomy":"topic","embeddable":true,"href":"https:\/\/www.edumails.cn\/en\/wp-json\/wp\/v2\/topic?post=2179"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}